SECTION IV. SPECIAL OPERATOR TASKS
SPEC TASK 1:
Transfer COMSEC/FH Data, ANCD to ANCD:
Used when individual operators are required to load their own ANCD
from a shared unit ANCD.
SPEC TASK 2:
Transfer QREF SOI Information, ANCD to ANCD:
Used when individual operators are required to load their own ANCD
from a shared unit ANCD.
SPEC TASK 3:
Perform Cold Start Net Opening:
Provides NCS an alternate method of net opening, if desired Net
operators respond to NCS direction to receive and store ERF
broadcast by the NCS.
SPEC TASK 4:
Receive Net Update ERF from NCS:
Used when NCS needs to update some element of FH data using
electronic transfer means Operator requirements are similar to the
Cold Start Net Opening.
SPEC TASK 5:
Perform CUE & ERF Late Net Entry:
Required when sync time in RT is more than 60 seconds different
from that of operational net SIP radio allows up to 100 hours sync
time difference for CUE and ERF late net entry.