POCKET GUIDE
TM 11-5820-890-10-6
PRIMARY TASK 3: Perform Hot Start Net Opening
SUBTASK
ACTION
RESULT
a. Load RT with
COMSEC/FH Date and
Time*
(See Primary Task 2 for
ICOM Fill)
COMSEC/FH data and
time load into all 6
channels of the RT
b. Enter net
Call NCS in CT, FH and
request to enter net
Hot Start net opening is
complete*
*All SIP radios will accept time from an ANCD as part of a loadset and from a PLGR as a
separate loading of time.
PRIMARY TASK 4: Perform Passive Late Net Entry (LNE)
SUBTASK
ACTION
RESULT
Use Passive Method of
(1) Press:
Late Net Entry
Entry
FREQ
Display shows
[F XXX]
Display shows
SYNC
[LF XXX]
(2) Wait for radio traffic
Display shows
to be heard
[F XXX] ("L" is dropped)
(Do not press PTT)
(3) Call NCS and
Passive LNE is complete*
re-enter net
*If traffic is not heard for 3 minutes or so after using Passive Late Net Entry method, use
the Hot Start procedure or CUE and ERF method
13